Záštita:Sponzoři: Mediální partneři:
MEZINÁRODNÍ ARCHITEKTONICKO-URBANISTICKÁ SOUTĚŽ
Projekt EUROPAN CZ probíhá za podpory Ministerstva kultury a České komory architektů

 
Výrobky z Eucoru Belgique Deutschland Espana France Hrvatska Italia Kosovo Nederland Norge Österreich Polska Portugal Suisse Suomi Sverige

Libramont (BE)





Category Town planning and architecture

Location Libramont-Chevigny, Train station quarter

Population 10,947 inhab.

Strategic site c. 32 ha - Project site 10 ha

Site proposed by Municipality of Libramont and Belgian Rail (SNCB)

Owner(s) of the site mostly SNCB, the Municipality and private individuals

Commision after competition Town planning study, architectural design of public spaces and certain buildings

Team representative town planner – landscape architect – architect

 

 

 

 

 

 

 

 

 

 

 

 

 

 



More info





How can the site contribute to the adaptable city?

In the heart of the province of Luxembourg, the municipality of Libramont-Chevigny is situated on the high plateau of the Belgian Ardennes. A simple hamlet up to the 19th century, the village of Libramont would grow after the arrival of the railway. The focal point of a rural region, Libramont boasts several public facilities: schools, hospital, cultural centre, exhibition centre, convention centre. Its development has in recent decades shifted to the Recogne commercial hub, situated 1.5 km from the centre. Today, a new development dynamism is gradually taking shape in the train station quarter. The upcoming release of all rail operation for part of the land in the South West of the railway lines constitutes a winning asset for the development of the centre of Libramont. The Municipality accordingly wants a master plan covering the entire area.

City strategy

Thanks to its “railway boom,” Libramont developed on either side of the railway line. The quarter of the centre to the South-West of the railway lines comprises many public buildings around the Place Communale. The North-south bank of the railway plays host to the intermodal hub and public facilities. The cut-off formed by the railway lines is crossed only at two points. The municipality wants to restructure two banks on either side of the train station and to link them so as to create the Heart of Libramont. This response to the needs to do with demographics, commerce and business facilities should boost the appeal of the train station and develop the administrative role of Libramont. Three lines of action have been determined: improve the functionality of the train station to turn it into a 21st century station, give new impetus to the forecourt of the train station by making it denser and connecting the quarters on either side of the railway line.

Site definition

The site comprises two parts separated by the railway. 1° the forecourt of the train station. The train station is used daily by nearly 3,000 passengers. The traffic flows – kiss and ride, bus stop, access to tracks – are no longer functional. The mobility around the train station must be reviewed giving preference to intermodal transport and non-motorised modes. Parking of cars in front of the train station is saturated and restructuring of the offer in parking for train passengers on either side of the tracks should reduce traffic on the crossing points of the tracks. 2° The Triangle in the South-West of the tracks. The SNCB will free all rail operation on this part of the site, particularly the “turnaround triangle”. The development of this site should make it possible to improve the reception functionalities of passengers – parking facilities, access to tracks, etc. and to connect the Place Communale with the forecourt of the train station.

Future of the site in relation to the site family and to Adaptability

The Heart of Libramont comprises 3 steps or “sub-projects;” 1° The connection between the Rue de l’Ancienne and the forecourt of the Train Station and its endings. For the link reserved for non-motorised modes (for pedestrians and bicycles), the Municipality wishes to build an underpass and not a footbridge, given the climatic constraints. This option must be included as a minimum, The underpass corridor ends in the South, with a new car park for passengers and a support building, and in the North on the foreground of the train station, which is to be redeveloped; 2° The quarter of the Train Station with 19,500 m² of dwellings, offices, shops and local services, and a parking facility for 500 places; 3° The Triangle with shared roads connecting the Rue de l’Ancienne Gare with the Place Communale by distributing a property development of 73,000 m² of dwellings, offices, shops and local services and a car park with 1000 places. The continuity of the entire functionality of the site – particularly the intermodal use of train/bus/car parks—must be ensured without fail, during the different development stages, whilst preserving access to the technical premises of the SNCB. Given the scope of the means and resources required for the development of the site, each of the three steps must be the subject of flexible and open-ended programming. The construction of the parking areas must be staggered and modular: the parking facilities for passengers are to be scheduled in an initial step, and the parking facilities for residents apace with the completion of the buildings. The space for offices and dwellings must be reversible to adapt to the development of needs not yet defined with precision. Finally, the planning must include a release of the land according to the choice of construction of the buildings and the development of public spaces.

 

Lokality Europanu:

Belgique
Libramont
Category Town planning and architecture
Charleroi
Category Town planning and architecture
Deutschland
Marl
Category Urban - landscape - architectural
Bamberg
Category Urban - landscape - architectural
Gera
Category Urban - landscape - architectural
Schwäbisch Gmünd
Category Urban - landscape - architectural
Selb
Category Urban architectural
Ingolstadt
Category Urban – landscape – architectural – traffic – sociology
Landsberg
Category Urban - landscape - architectural
Feldafing
Category Urban - landscape - architectural
España
Irun
Category Urban
Barcelona
Category architectural
A Coruña
Category Urban - architectural
Palma
Category Urban - architectural
France
Bondy
Category Urban - architectural
Goussainville
Category Urban - architectural
Marne-la-Vallée
Category Urban - architectural
Saint-Brieuc
Category Urban - architectural
Metz
Category Urban
Montreuil
Category Urban - environmental - architectural
Moulins
Category Urban - environmental - architectural
La Corrèze
Category Urban - architectural
Bordeaux
Category Urban planning - architectural
Hrvatska
Zagreb
Category Urban - architectural
Italia
Molfetta
Category Urban - architectural
Kosovo
Gjakova
Category Urban - architectural
Nederland
Leeuwarden
Category strategic - urban - architectural
Streefkerk
Category urban - architectural
Norge
Trondheim
Category urban - architectural
Ørsta
Category urban - architectural
Bergen
Category urban - architectural
Os
Category urban - architectural
Stavanger
Category urban - architectural
Österreich
St Pölten
Category urban - architectural
Wien
Category urban - architectural
Graz
Category architectural urban scale
Bruck/Mur
Category urban - architectural
Linz
Category urban - architectural
Polska
Warszawa
Category Architectural - landscape
Portugal
Santo Tirso
Category urban - architectural
Barreiro
Category landscape - architectural
Azenha do Mar
Category urban - architectural
Suisse
Genève
Category urban - architectural
Suomi - Finland
Seinäjoki
Category urban - architectural
Jyväskylä
Category urban - architectural
Espoo
Category urban - architectural
Sverige
Nacka
Category urban - landscape - architectural
Lund
Category urban - landscape - architectural